CCNA 4 Final Exam 2011 Answers Updated

CCNA 4 Final Exam 2011 Answers Updated

1
Refer to the exhibit. Branch A has a non-Cisco router that is using IETF encapsulation and Branch B has a Cisco router. After the commands that are shown are entered, R1 and R2 fail to establish the PVC. The R2 LMI is Cisco, and the R1 LMI is ANSI. The LMI is successfully established at both locations. Why is the PVC failing?

The PVC to R1 must be point-to-point.
LMI types must match on each end of a PVC.
The frame relay PVCs cannot be established between Cisco and non-Cisco routers.
The IETF parameter is missing from the frame-relay map ip 10.10.10.1 201 command.
READ MORE » CCNA 4 Final Exam 2011 Answers Updated

CCNA 1 Final exam 2011 French

Thank B.M.B Send it to me!
Download CCNA 1 Final exam 2011 French now
READ MORE » CCNA 1 Final exam 2011 French
 
Design by ccna v5